Preparing your site for a shipping container: what the truck needs and how to get it right

6 min read

Ordering a container is the easy part. Getting it delivered is where most first-time buyers run into surprises, and almost every refused delivery comes down to one of three things: not enough straight-line room for the truck, ground that will not support the weight, or overhead wires and branches nobody thought to check.

None of them are hard to fix if you know they matter. Here is what to sort out before you set a delivery date.

How much space does a container truck actually need?

Almost all US container deliveries use a tilt-bed truck. The bed tips backwards, the container slides off the back, and the driver pulls forwards while it settles onto the ground. It looks like a very slow tow truck.

The straight-line room the truck needs to do this varies by container size:

  • 20ft container: around 65 feet of straight run
  • 40ft container: 100 to 120 feet of straight run
  • 45ft and 53ft: 130 feet or more

That is space in a straight line from where the truck stops to where the container ends up. Tight bends, gates or narrow passages within that stretch usually mean the driver either cannot deliver or has to charge for extra time and a smaller truck.

You also need 12 feet of width for the truck to pass, and at least 14 feet of vertical clearance for the tilt-bed to lift. If the drop-site has overhead cables, tree branches or a low porch overhang below that, the truck cannot complete the delivery.

Full details, including diagrams, are on our access requirements page.

What the ground has to look like

A shipping container is heavier than most people expect. An empty 20ft weighs about 5,000 lb. A 40ft high cube weighs closer to 8,700 lb. Loaded, the numbers get much bigger.

The ground under the four corner castings needs to be:

  • Level. A container sitting on uneven ground twists slightly, and a twisted container has doors that stop closing properly. Small differences you would not notice walking are enough to matter.
  • Firm. Compacted gravel, concrete or asphalt are ideal. Grass over topsoil is not: the corner castings sink over time, and once they are down half an inch you have the same door problem as an uneven site.
  • Drained. Water pooling around the base rusts the corner castings and rots any timber sleepers underneath. If the site slopes toward the container, dig a shallow drain uphill.

Most people set containers on timber sleepers or concrete blocks under each corner. That raises the box a few inches off the ground, keeps standing water off the floor, and gives the doors room to swing without catching. It also makes the container easier to level.

Our site preparation guide covers this in more detail, including what timber and block spec to buy locally.

The overhead wires question

This is the one most often missed. Look up. If there is a power line, phone line or tree branch anywhere between the truck's parking spot and the drop point, measure the height. Below 18 feet and the tilt-bed cannot operate underneath it.

If the container has to pass under the wire on the way in, that number applies for the whole run, not just the drop point. It is not enough for the wire to be high at the drop-site if the truck has to duck under something lower to get there.

Where there is no way around it, delivery becomes a crane job. A crane delivery is quoted separately and typically costs $500 to $1,500 on top of standard haulage, depending on the crane size and site location.

When you need a crane

Cranes get used when:

  • The final position is a back garden or interior yard with no truck access
  • The container is going on a foundation, plinth or container-home base
  • Overhead lines are too low for the tilt-bed to operate
  • The container has to be lifted over a wall, fence or building

Cranes are also useful for a 40ft high cube, where the extra foot of height rules out some low-clearance access. If you think you might need a crane, tell us before we quote. Retro-fitting a crane on delivery day is expensive and there is often a two-week wait.

Common site problems and how to solve them

The driveway curves

A 40ft tilt-bed cannot turn sharply once loaded. If your driveway has a bend tighter than about a 40-foot radius, the truck can usually still deliver, but it may need to reverse the length of the driveway to line up. Ask when you book. If access is genuinely blocked, a smaller truck or a crane may be the answer.

The site slopes

Modest slopes are fine to deliver on and then level with sleepers. Steep slopes, anything more than about ten percent, usually mean the container has to be delivered to a flat area near the site and moved into position with a machine. That is an extra cost you want to know about in advance.

The gate is only ten feet wide

A gate under 12 feet will not clear the truck. Options are to take the gate off temporarily, deliver outside the gate and use a machine to move the container in, or use a crane to lift over.

There is no legal parking near the site

In dense residential streets the truck sometimes needs a temporary parking permit. It is the same permit a builder or moving company would need. Call your local public-works or streets office. Most cities issue a one-day permit for $30 to $80.

A short pre-delivery checklist

Two days before delivery, walk the route the truck will take. Look up, look down, and pace it out.

  • Measure the straight-line run from the truck's parking spot to the drop point
  • Check the height of every wire, branch and overhang between them
  • Look at the ground at the drop point: level, firm, drained
  • Have the sleepers or blocks on site ready to go under the corners
  • Confirm there is nothing parked in the way (bins, cars, kids' bikes) on the delivery morning

If any of those items is a problem, tell us before delivery day. We would rather reschedule than see a refused delivery. Our delivery timelines page covers rescheduling and what happens if the truck arrives and cannot complete.

Delivery by state

Delivery access is not identical everywhere. Winter frost heave in Minnesota, salt-air corrosion on the Gulf coast, monsoon washouts in Arizona: local conditions shape what a good site looks like. Our state pages cover the local delivery lanes we run and what tends to trip people up in each state.

The short version

A tilt-bed truck needs 100 feet of straight room, 12 feet of width, 14 feet of overhead clearance and firm level ground. Get those four right and delivery goes fine. Get one of them wrong and you will be paying for a redelivery or a crane you did not plan for.

If any part of that is unclear for your site, send us a photograph of the access and we will tell you honestly whether it is going to work.